The MCBs ought to be clipped onto the Din bar and the busbar into a recent flowing terminal and restricted screwed to offer latest into the MCBs.Two 16/25mm tail cables, a single neutral and one other active are connected to the principle double pole switch with the meter. The primary https://gardenpowerinstallationuk23456.luwebs.com/36034488/the-best-side-of-house-rewiring-services-uk