1

Advanced 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://businessbookmark.com/story6239118/advanced-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story